• Central Heating Plant for Imam Khomeini Airport buildings

  • Contract Owner The Airline of the Islamic Republic of Iran
    Project Description:

    • Construction of the building for the main central heating plant (2000 square),

    • Procurement and installation of three absorption chillers (EBARA), each with 800 ton capacity.

    • Procurement and installation of three Packman boilers with 19 million BTU as well as three
    American Caterpillar 900 kva diesel generators

    • installation of steel pipes; total installed OD surface area = 150000 inches

    • 40 km of Structured cabling

    • Installation of various equipment such as cooling towers, pumps, expansion tanks, water
    softeners, valves, and landscaping.