• Intake Tower and Pump stations for Golabar Dam

  • Contract Owner Ministry of Energy – Regional Water Company of Zanjan Province.
    Project Description:

    • Engineering, procurement and Construction of the intake tower, the main pump station, and
    steel pipe water transmission pipelines to pump station #2.

    • Construction of the main pump station including eight Kubota vertical submersible pumps
    with 360 kW Mitsubishi electrometers ; total capacity: 40740 l/s.

    • Construction of the pump station #2 including: six 340 kW Pump Iran ground pumps (with
    German electrometers); total capacity: 9936 l/s.

    • Construction of the electric power transmission network with medium and low voltage
    transmission lines, 20 kW electrical substation, ground-mounted and pole mounted
    transformer.