• Bandar Gaz Industrial Park - Wastewater treatment plant

  •  Contract Owner Ministry of Energy – Golestan Province Industrial Parks Company
    Population covered 150000
    Average capacity 30000 m3 per day
    Project Description:

    • Design, construction, commissioning and startup for the 2nd module of the wastewater plant
    including: AFBR (anaerobic fluidized bed reactor) and EAAS (Extended Aeration Activated
    Sludge), sedimentation tanks, excess sludge tank, disinfection process, sludge thickening and
    dewatering process, and saturated air unit.

    • Additional work on module 1 of the wastewater plant: improving the existing equalization tank
    and increasing its capacity as well as building a new equalization tank.